Separators & treaters
Two- and three-phase, horizontal and vertical. Heated treaters with firetubes, BMS-ready. Internals sized to your flow — weirs, buckets, mist pads, sand jets.
ASME VIII Div. 1Vessels & skids · Grande Prairie, AB
ASME pressure vessels and process skids, fabricated in Grande Prairie for producers and EPCs across Western Canada. Two bays, 40 tonnes of hook, and a data book that's finished before the truck is.
OpenBay 2 · week of Nov 16 · quote now to hold it01 / Capabilities
We don't do structural steel, tanks or field welding on the side. Pressure equipment and the skids it sits on — designed to your datasheet, stamped, tested and shipped from one yard.
Two- and three-phase, horizontal and vertical. Heated treaters with firetubes, BMS-ready. Internals sized to your flow — weirs, buckets, mist pads, sand jets.
Inlet, suction and discharge scrubbers, flare knockout drums, filter separators. Vane packs and mesh pads specified, not guessed.
Indirect water-bath heaters with removable firetubes and coil bundles. Process coils hydrotested separately, then as an assembly.
Orifice, Coriolis and ultrasonic meter runs to AER Directive 017. Chemical and methanol injection with pumps, tanks and heat trace.
B31.3 process piping in carbon, low-temp and stainless. Spool-numbered, weld-mapped, tagged to your isometrics — shipped in install order.
Vessels, piping, electrical and instrumentation built into one shippable module. Pre-wired, loop-checked, ready to set and tie in.
02 / Shop capacity
This is the board on the wall of our shop office, updated every Friday by the shop super. If a week is green, it's open. If you need it, quote now — slots go to the first signed PO.
Swipe the board →
Next open slot: Bay 2, week of Nov 16 — quote now to hold it.
Hold Bay 2 · Nov 1603 / Quality
Our ABSA-accepted quality program runs every job the same way, whether it's one scrubber or a forty-tonne module. Your inspector gets an ITP at kickoff and a phone call before every hold point.
Every plate, pipe, forging and fitting checked against its mill test report — heat numbers transferred and logged before it's cut.
Hold pointBevels, root gaps, alignment and nozzle orientation checked against the drawing by our QC inspector before a root pass goes in.
Hold pointEach weld tied to a welder, a WPS and an NDE report. RT, PAUT, MT and PT to code — or to your spec, whichever is stricter.
Witness pointCalibrated gauges, a chart recorder and the hold time written on the ITP. Witnessed by the Authorized Inspector and, if you want, by you.
Hold pointCompiled as we build, not after. Reviewed by QC, indexed and sent electronically the day the vessel ships.
Ships with itNot "to follow." Not a week later after three emails. In the truck's paperwork and in your inbox the same day.
04 / Track record
Twenty-two years building for operators in the Montney, Duvernay and Peace River Arch — most of whom found us through someone who'd already worked with us.
Vessels and skids shipped since 2004.
Shipped on or before the date on the quote.
Trailing 36 months · 211 jobsYears in Grande Prairie. Same yard, same owner.
Hours worked since our last recordable.
COR holder · audited 2026We sent the RFQ cold on a Tuesday. Budget number Thursday, firm quote the next week, and the data book was complete the day the separators landed. That's rarer than it should be.
Their QC inspector calls us before a hold point, not after. Four years of skids and we haven't written them a single NCR.
05 / Careers
Day shift. Home every night. Rates posted right here, because "competitive" doesn't tell you anything. If you can pass a bend test, we want to meet you this week.
SMAW and GTAW on carbon and low-temp; FCAW a plus. Vessels, nozzles and heavy-wall spools. Top-of-market for the Peace Country — the high end goes to welders who can run stainless root and hot pass.
3 openings · Shop · Grande PrairieRead isos and vessel drawings, lay out nozzles, fit to tolerance without being babysat. Journeyman Steamfitter-Pipefitter or Welder with real fitting time.
2 openings · Shop · Grande PrairieOwn the ITP from MTR review to data book. CWB Level 2 or API 510 required; ASME VIII and ABSA quality program experience strongly preferred.
1 opening · Salaried · Grande PrairieNo résumé needed. The shop super calls you back within one business day.
The shop super will call you within one business day to book your test. Bring your ticket and your hood.
06 / Request for quote
Estimating
rfq@chinchagafab.example
(780) 555-0142 · Mon–Fri, 6:30–5:00
An estimator has it now.